Since the construction works for the second entry to the Salem Junction
is being taken up at present, the staircase in PF No.5 to reach the Foot Over
Bridge in Salem Junction, is being closed from 14.10.2016 to 27.10.2016, with a
view to facilitate the preliminary works. Hence, passengers are requested to
make use of the existing subway to reach PF No.5, during the above period.
No comments:
Post a Comment