Friday, 6 February 2015

Passenger trains’ stoppage at Anangur and Mavelipalayam on experimental basis

T.Nos.66602/66603 Coimbatore-Salem-Coimbatore Mainline Electric Multiple Unit (MEMU) passenger Trains and T.Nos. 56100/56101 Erode-Metturdam-Erode Passenger Trains will be temporarily stopped at Anangur and Mavelipalayam, for a period of 6 months from 14.02.2015 to 13.08.2015, on experimental basis, to the following timings:


T.No.66602 Salem-Coimbatore MEMU  (a/d)

T.No.66603 Coimbatore Salem
MEMU (a/d)
13.57/13.58
Magudanchavadi
12.14/12.15
14.09/14.10
MAVELIPALAYAM
12.07/12.08
14.15/14.16
Sankaridurg
11.59/12.00
14.22/14.23
ANANGUR
11.50/11.51
14.29/14.30
Cauvery
11.39/11.40

T.No.56101 Mettur Dam – Erode Passenger Tn (a/d)

T.No.56100 Erode-Mettur Dam
Passenger Train (a/d)
20.24/20.25
Magudanchavadi
05.39/05.40
20.37/20.38
MAVELIPALAYAM
05.32/05.33
20.49/20.50
Sankaridurg
05.24/05.25
20.56/20.57
ANANGUR
05.14/05.15
21.24/21.25
Cauvery
05.07/05.08

No comments:

Post a Comment