T.Nos.66602/66603
Coimbatore-Salem-Coimbatore Mainline Electric Multiple Unit (MEMU) passenger
Trains and T.Nos. 56100/56101 Erode-Metturdam-Erode Passenger Trains will be
temporarily stopped at Anangur and Mavelipalayam, for a period of 6 months from
14.02.2015 to 13.08.2015, on experimental basis, to the following timings:
T.No.66602 Salem-Coimbatore
MEMU (a/d)
|
T.No.66603 Coimbatore Salem
MEMU (a/d)
|
|
13.57/13.58
|
Magudanchavadi
|
12.14/12.15
|
14.09/14.10
|
MAVELIPALAYAM
|
12.07/12.08
|
14.15/14.16
|
Sankaridurg
|
11.59/12.00
|
14.22/14.23
|
ANANGUR
|
11.50/11.51
|
14.29/14.30
|
Cauvery
|
11.39/11.40
|
T.No.56101 Mettur Dam –
Erode Passenger Tn (a/d)
|
T.No.56100 Erode-Mettur
Dam
Passenger Train (a/d)
|
|
20.24/20.25
|
Magudanchavadi
|
05.39/05.40
|
20.37/20.38
|
MAVELIPALAYAM
|
05.32/05.33
|
20.49/20.50
|
Sankaridurg
|
05.24/05.25
|
20.56/20.57
|
ANANGUR
|
05.14/05.15
|
21.24/21.25
|
Cauvery
|
05.07/05.08
|
No comments:
Post a Comment