The financial
performance of Salem Division, from November 2015 to October 2016 is as follows (comparative
performance during the same period last year are also given on the side:
Amt in Lakhs
|
Amt in Lakhs
|
|
Head of Revenue (Nov-Oct)
|
2015-16
|
2014-15
|
ATM
|
54.69
|
61.35
|
Catering
|
3,07.88
|
3,08.29
|
Freight
|
54,43
|
61,28
|
GROSS EARNINGS
|
620,18
|
610,07
|
Loading (in MTs)
|
7,74.02
|
7,46.72
|
Originating Passengers (in Lakhs)
|
3,61.32
|
3,74.77
|
Other coaching
|
44,37
|
37,77
|
Parcel
|
19,78.19
|
21,90.5
|
Parking
|
3,03.66
|
3,32.30
|
Publicity
|
3,43.31
|
5,43.11
|
Retiring Rooms
|
54.18
|
44.84
|
Sundry Earnings
|
23,54
|
31,84
|
Ticket Checking
|
5,53.94
|
4,75.69
|
GRAND TOTAL
|
1287,67.19
|
1270,91.57
|
The fall in revenue on ATM, Catering, Freight,
Parcel, Parking are in line with the trend all over Indian Railways and not
specific to Salem Division alone. However, Salem Division, being a passenger
oriented Division, has performed better on that front.
In addition, during the last year, various passenger
amenities were added in the stations of Salem Division, such as Escalators in
Salem Junction, Passenger Waiting Hall in Karur junction, New AC waiting Hall
in Salem & Coimbatore Junctions (including AC dormitories in Coimbatore
Junction), New Multifunction Complex near Salem Junction, new Station Buildings at Vijayamangalam and
Thottipalayam (near Tiruppur), etc. Various
special trains have been operated including the day time Express from Erode to
Chennai Egmore.
At present, the following works have been taken
up:
Construction of second entry to Salem Junction
to ease congestion, for which preliminary works have already started by
extension of Foot Over Bridge.
Installation of escalators and lifts at
Coimbatore (including sky walk connecting Platform 1-A to the foyer area) and
Erode junctions. Works are underway for these two projects.
Multi-level car parking at Coimbatore junction
(in planning stage)
Extension of platforms at Mettupalayam to
accommodate 24 coaches
Construction of new station buildings at
Thudiyalur (participation from the TN State Government) and
Periyanaickanpalayam (under CSR (corporate social responsibility) scheme in Coimbatore-Metupalayam section.
Foundation stone has been laid for construction
of a new BG line between Chinna Salem and Kallakurichi with 50% fund
contribution from the Government of Tamil Nadu