Wednesday 6 December 2017

Change in the operation of trains on 08.12.2017 and 09.12.2017

To ensure safe operation of trains, the track maintenance works are being carried out by Salem Division, Southern Railway, on regular basis. As a part of the same, on 08.12.2017 and 09.12.2017, track maintenance works are being undertaken near Veerapandi Railway Station, and as a result, the following changes are made in the operation of trains passing through Salem Division:

08.12.2017
1. Train no.66602 Coimbatore-Salem Passenger Train  (MEMU) is partially cancelled between Erode and Salem and the train will be terminated at Erode.
2. Train no.66603 -Salem Coimbatore Passenger Train  (MEMU) is partially cancelled between Salem and Erode and the train will start from Erode instead of Salem.

09.12.2017
1. Train no.66602 Coimbatore-Salem Passenger Train (MEMU) is partially cancelled between Erode and Salem and the train will be terminated at Erode.
2. Train no.66603 -Salem Coimbatore Passenger Train (MEMU) is partially cancelled between Salem and Erode and the train will start from Erode instead of Salem.
3. Train No.13352-Alleppey-Dhanbad/Tata Express will be delayed at Magudanchavadi Station and will be operated with a delay of by 15 minutes in the running. 

Passengers may please make a note of the above and plan their journeys accordingly.

No comments:

Post a Comment