On
11.09.2016, Sunday, The following changes are made in the operation of Passenger
trains in Salem Vridhachalam Section, in view of the construction of Limited
Use Subway in place of unmanned LC No.160 in between Ethapur and Minnampalli
Railway Stations.
1.
T.No.76850 Salem Vridhachalam passenger is to be
rescheduled to leave Salem at 16.00 hrs (370 mts late) instead of Scheduled
Departure of 09.50 hrs
2.
T.No.76849 Vridhachalam Salem Passenger will be
rescheduled to leave Vridhcahalam at 19.45 hrs (375 mts late) instead of the
Scheduled Departure of 13.30 hrs and the train will arrive at Salem 390 mts
late (23.15 hrs).
3.
T.No.76848 Salem Vridhachalam passenger will be
rescheduled to leave Salem at 23.45 hrs (315 mts late) instead of
Scheduled Departure of 18.30 hrs
4.
T.No.56513 Karaikal-Bangaluru Passenger is rescheduled to
leave Karaikal late by 240 minutes and will start at 07.40 hrs. instead of Scheduled
departure of 03.40 hrs.
5.
T.No.56514 Bangaluru-Karaikal passenger will be delayed
at Salem up to 16.15 hrs (195 mts late) instead of scheduled departure of 13.00
hrs.
No comments:
Post a Comment